NEWS / London Olympics team positions latest bridge

Twitter
Facebook

Skanska has installed a new bridge that will link the London Olympics park with local communities in Hackney and Waltham Forest.

A crane was used to lift the 200t arched Ruckholt Road Bridge, which is 42m long and 6m wide. An additional temporary bridge was also lifted into place to provide additional capacity during the Olympic Games

Construction (1) | Lifting & launching (1)

Post Comment