04 July 2012
The Adriatic Group and design firm Lotus Architecti have proposed a floating structure for the Peljesac Bridge project in Croatia.
Financial reasons had led the Croatian government to halt the contract for construction of the bridge in May.
The Adriatic Group and Lotus believe that a floating bridge would pay for itself within 10-15 years. The bridge would be some 2.4km long.
Design (1) |