|
Email Updates
Archives
|
Mott MacDonald wins Korean contracts
Published: August 17, 2005
Yooshin Engineering has awarded Mott MacDonald two contracts in Korea. One is the design review for the 800m main span cable-stayed bridge to Korea’s new airport on Incheon Island. The bridge is part of a 12km road link that includes approach bridges and viaduct spans. The US$1.24 billion bridge is due for completion on October 2009. The other contract involves assisting in supervision of a US$1.6 billion fixed link from the Korean mainland near Busan to the island of Geoje. The project will involve building two cable stayed bridges with main spans of 475m and 230m, and an immersed tube tunnel 3.7km long. |
Calendar
|