Bridge design & Engineering home
Bridge design & Engineering logo
menu
  • Sign Out
  • Edit My Account
menu
  • Sign In
  • Latest
    • News
    • Features
    • Issue
    • Videos
    • Events & Webinars
    • On-Demand Learning
    • B2P - Builds
    • Bentley Microsite
  • Magazine
    • Current Issue
    • Back Issues
    • Supplements
    • BD&E Presents
  • Directory
  • Business
    • Company Profile
    • New products
    • Equipment
    • Jobs
  • Channels
    • Asset management
    • Business and finance
    • Construction
    • Design and analysis
    • Failures and accidents
    • Project reports
    • Technology
  • Our Events
    • Bridges 2026
    • Bridges Scotland 2026
    • Bridges Awards 2025
  • Contact
    • Our Team
    • Advertise
    • GET MEDIA KIT
    • Get Published

Share

  •  
  •  
  •  
  •  

Business and finance

26 Oct 06

Contract let for toll bridge rehabilitation

Delaware River Joint Toll Bridge Commission has awarded Conti Enterprises a contract worth more than US$87 million for rehabilitation of the the Trenton-Morrisville (Route 1) Toll Bridge. The project is aimed at improving safety and reducing congestion. Work includes adding a northbound auxiliary lane as well as toll plaza improvements, new noise barriers and improved interchange access.

#Finance #Maintenance & refurbishment
comments powered by Disqus

Related Articles

Knik Arm Crossing team publishes new study image

Knik Arm Crossing team publishes new study

Australian bridges damaged by flooding image

Australian bridges damaged by flooding

Consortium wins US$625 million design-build contract  image

Consortium wins US$625 million design-build contract

Macdonald Bridge upgrade to begin in 2015 image

Macdonald Bridge upgrade to begin in 2015

Share

  •  
  •  
  •  
  •  

Latest News

  • Bridge demolition shows true meaning of “Germany’s speed”
  • Australia: preparing for zero-carbon concrete
  • US$650,000 in prizes for beautifying USA’s infrastructure
  • Laos: funding boost for Japanese girder recycling research
  • Brazil: Guaratuba Bridge approaches finish
  • More News

Related Articles

Knik Arm Crossing team publishes new study image

Knik Arm Crossing team publishes new study

Australian bridges damaged by flooding image

Australian bridges damaged by flooding

Latest News

  • Bridge demolition shows true meaning of “Germany’s speed”
  • Australia: preparing for zero-carbon concrete
  • US$650,000 in prizes for beautifying USA’s infrastructure
  • Laos: funding boost for Japanese girder recycling research
  • Brazil: Guaratuba Bridge approaches finish
  • More News
  • Copyright © 2026 - Hemming Group Ltd All rights reserved.
  • Privacy Policy | Terms & Conditions

 

logo

Important Update: Bridge Design & Engineering Magazine


For more than 31 years, Bridge Design & Engineering has been a trusted source of new insights, knowledge, and connections for the global bridge community.  With the rapid shifts in the publishing landscape and increasing costs, sustaining the printed magazine at the high level of quality our readers expect has become increasingly challenging.  After careful consideration, Hemming Group Ltd has made the difficult decision to discontinue the print publication.


You will continue to have full access to the Bridge Design and Engineering website - including the complete archive. Although the site will no longer be updated, the archive remains a rich resource of engineering knowledge and project insight.  You can also continue to access the Bridge Directory, IBIG, through the website or directly at: https://www.bdeibig.com/


While this marks the end of an era, it also opens a new chapter, one focused on strengthening the connections, collaboration, and technical excellence that our community thrives on.  Our energy and investment will now be directed toward expanding and enhancing our industry leading events that bring the bridge community together.


Our flagship events Bridges and Bridges Scotland will continue to thrive as essential annual gatherings for bridge owners, managers, designers, engineers, and suppliers.  These events play a vital role in sharing innovation, showcasing best practice and emerging technologies, and fostering meaningful collaboration across the industry.  We are excited to build on their success and will further develop these events in the years ahead.


For more information, please email enquiry.bridge@hgluk.com