Installation starts this week to install state-of-the-art dehumidification equipment on the main cables of the Forth Road Bridge in Scotland. The Forth Estuary Transport Authority appointed C Spencer to carry out the work. Bennett Associates will be working alongside C Spencer on the US$15.6 million contract, which involves installing equipment to inject dry air into the two main cables.