The floating bridge, which is vulnerable to earthquakes and high wind, is - like other structures on the route - to be replaced with a safer, more reliable crossing. A draft environmental impact statement produced last year raised issues where the public was concerned about the proposals and so a supplemental version is to be issued with additional analysis of these areas. The department is working with local jurisdictions on aspects including mitigation and design plans and advancing the engineering for the floating bridge.