The US$1.6 million contract involves the preparation of a feasibility study followed, if required, by scheme design, contract administration and site supervision. The scope covers replacement of the approach viaduct's bearings and expansion/articulation joints as well as the replacement or refurbishment of the expansion joints on the suspended span and footway/cycleway. Eleven bids were received for the contract.