The study will take about a year to complete and represents the first phase of a multi-year project. The bridges are each about 1.6km long and are about 13km apart, separated by a national recreation area called the Land Between the Lakes. Each bridge will have a navigation span of at least 150m. Baker will be assisted by Palmer Engineering Company under a subcontract.