The cable will follow the path of the bright orange cable catwalks, which have been in place for several months. Workers will use the catwalks during the installation process. Placing the first strand is expected to take approximately two days.

The main cable will anchor into the east end of the deck and travel up and over the top of the tower, which is equipped with the world’s largest cable saddle. After it crosses over the tower, the cable travels down to loop around the span’s west end before heading back in the same path to anchor into the east end.