Bridge design & Engineering home
Bridge design & Engineering logo
menu
  • Sign Out
  • Edit My Account
menu
  • Sign In
  • Latest
    • News
    • Features
    • Issue
    • Videos
    • Events & Webinars
    • On-Demand Learning
    • B2P - Builds
    • Bentley Microsite
  • Magazine
    • Current Issue
    • Back Issues
    • Supplements
    • BD&E Presents
  • Directory
  • Business
    • Company Profile
    • New products
    • Equipment
    • Jobs
  • Channels
    • Asset management
    • Business and finance
    • Construction
    • Design and analysis
    • Failures and accidents
    • Project reports
    • Technology
  • Our Events
    • Bridges 2026
    • Bridges Scotland 2026
    • Bridges Awards 2025
  • Contact
    • Our Team
    • Advertise
    • GET MEDIA KIT
    • Get Published

Share

  •  
  •  
  •  
  •  

Asset management

10 Nov 04

Central Vietnam's longest bridge opens

Vietnam's prime minister Phan Van Khai has inaugurated the 1.5km Da Rang bridge over the Ba River, together with over 12km of approach roads. Construction of the US$20.4 million project took just 16 months. The original bridge was in poor condition and its replacement is intended to help boost economic growth in the Phu Yen province and the wider region.

#Maintenance & refurbishment
comments powered by Disqus

Related Articles

Chesapeake Bay Bridge reopens after movement scare image

Chesapeake Bay Bridge reopens after movement scare

Exceptional flooding triggers bridge inspections across Cumbria image

Exceptional flooding triggers bridge inspections across Cumbria

Rehabilitation set for Riverton-Belvidere image

Rehabilitation set for Riverton-Belvidere

Arlington Memorial Bridge needs $250m overhaul image

Arlington Memorial Bridge needs $250m overhaul

Share

  •  
  •  
  •  
  •  

Latest News

  • Bridge demolition shows true meaning of “Germany’s speed”
  • Australia: preparing for zero-carbon concrete
  • US$650,000 in prizes for beautifying USA’s infrastructure
  • Laos: funding boost for Japanese girder recycling research
  • Brazil: Guaratuba Bridge approaches finish
  • More News

Related Articles

Chesapeake Bay Bridge reopens after movement scare image

Chesapeake Bay Bridge reopens after movement scare

Exceptional flooding triggers bridge inspections across Cumbria image

Exceptional flooding triggers bridge inspections across Cumbria

Latest News

  • Bridge demolition shows true meaning of “Germany’s speed”
  • Australia: preparing for zero-carbon concrete
  • US$650,000 in prizes for beautifying USA’s infrastructure
  • Laos: funding boost for Japanese girder recycling research
  • Brazil: Guaratuba Bridge approaches finish
  • More News
  • Copyright © 2026 - Hemming Group Ltd All rights reserved.
  • Privacy Policy | Terms & Conditions

 

logo

Important Update: Bridge Design & Engineering Magazine


For more than 31 years, Bridge Design & Engineering has been a trusted source of new insights, knowledge, and connections for the global bridge community.  With the rapid shifts in the publishing landscape and increasing costs, sustaining the printed magazine at the high level of quality our readers expect has become increasingly challenging.  After careful consideration, Hemming Group Ltd has made the difficult decision to discontinue the print publication.


You will continue to have full access to the Bridge Design and Engineering website - including the complete archive. Although the site will no longer be updated, the archive remains a rich resource of engineering knowledge and project insight.  You can also continue to access the Bridge Directory, IBIG, through the website or directly at: https://www.bdeibig.com/


While this marks the end of an era, it also opens a new chapter, one focused on strengthening the connections, collaboration, and technical excellence that our community thrives on.  Our energy and investment will now be directed toward expanding and enhancing our industry leading events that bring the bridge community together.


Our flagship events Bridges and Bridges Scotland will continue to thrive as essential annual gatherings for bridge owners, managers, designers, engineers, and suppliers.  These events play a vital role in sharing innovation, showcasing best practice and emerging technologies, and fostering meaningful collaboration across the industry.  We are excited to build on their success and will further develop these events in the years ahead.


For more information, please email enquiry.bridge@hgluk.com