The proposal from Figg Bridge Developers involves a two-lane bridge with a high-level fixed span to allow clearance for shipping.

Consent from the US Coast Guard is still required before construction of the US$100 million bridge can begin.

The existing 70-year-old bridge has been closed since November because of safety concerns.