The bridge replaces a heavily loaded 1918 structure which was structurally deficient and had suffered differential settlement. The 401m bridge takes road traffic across 33 busy rail lines and has a superstructure of three three-span continuous welded plate girder units.

It is the first of 11 schemes to be completed under the state's Portway project to improve access between key places such as port and rail facilities.