The 38-month project includes the reconstruction of one of the most highly travelled sections of Ohio’s interstate system within the heart of Columbus. More than 20 new bridge structures will be built as part of the project.

As a member of the Kokosing Construction design-build team, Delcan will carry out  independent quality verification. Delcan will review the design and inspect and test all construction work to confirm compliance to contract requirements.

Delcan’s quality management data system will be integrated with project schedule, budget and risk management tools and Delcan will also maximise the use of digital information with the use of GPS-enabled field data collection tools.