The bridge is almost 1km long and has a main span of 376m and a single 200m-tall pylon.

The bridge is seen as vital in solving the city's traffic problems and Tadic spoke in favour of bridges that present engineering and scientific challenges, rather than being purely architectural or artistic. He praised the special role of builders of bridges, roads, rail and infrastructure projects.

Djilas thanked everyone who had spent the last three years working in temperatures from -10