The US$210 million build-operate-transfer project is part of Section 18 of the new Highway 6, a public-private partnership venture that is Israel's largest-ever infrastructure project. Finley is performing a redesign of the Section 18 bridge structures to optimise the efficiency of materials and construction. The bridges will be built using the balanced cantilever method. The new design features external continuity post-tensioning systems and enhanced post-tensioning durability details.