The 195m-long structure across the Moscow River is part of a project to reconstruct and develop the city’s railway inner belt. 

The construction crew will remove temporary supports in the river channel by November this year and prepare the bridge for installation of railway tracks.

The project includes five more bridge installations, with all five structures due to be commissioned before the end of this year.