Golden State Bridge is carrying out a seismic retrofit of the 220m-high structure. Included in the project is the bridge’s first repaint since its opening in 1972. The contractor faces the challenge of removing 40-year-old lead paint without contaminating the canyon below. The pedestrian railing is also being replaced and raised from 1.2m to 2m to help prevent people jumping from the bridge.