Francesco Poma, project director at Salini Impregilo, presents a number of different aspects of the job site, including the construction of the viaduct's 18 reinforced concrete piers and the 1.5m-diameter piles supporting them. Viewers can interact with each scene by exploring a full 360° view with their mouse or trackpad, even when the video is paused.
Construction
360° virtual tour of the Polcevera Viaduct replacement project
Take a guided tour of the site of the 1,067m-long bridge being fast-tracked as a replacement for its predecessor, which collapsed in 2018.