The bridge will be some 5.4km long and will cross the Padma River between Mawa and Janjira. A feasibility study carried out for the Jamuna Multipurpose Bridge Authority by the Japan International Cooperation Agency concluded that the best design alternative was a prestressed concrete extradosed box girder design.