The bridge in the state of Rhode Island will incorporate five existing piers and connect with waterfront parks either side of the river. There will be places for people to gather along the bridge.

The latest design features changes made since the original design competition was held in 2010, but the local council said that it still retains the essential character of the winning concept. Changes include a reduction in the total area of the bridge and the elimination of event space on the lower level. Combined lighting and seating elements have also been added.



Design work is continuing and the project is expected to be tendered by the end of the year so that construction can start in spring 2015.