The route features the 8.8km Chongming North Bridge, which is mostly on viaduct but includes a 730m cable-stayed main span over the central navigational channel.

The bridge was designed by a team of Cowi, Halcrow and Shanghai Municipal Engineering Design Institute.

The crossing provides the first fixed link to the island, which previously relied on 18 ferry routes.