The construction arm of Larsen & Toubro has won the contract, which is worth US$215 million.

The 714m-long, six-lane bridge will be built alongside the existing Iswar Gupta Setu Bridge at Kalyani, about 50km north of Kolkata. The project also involves a 20km elevated corridor and widening of the existing road.