Bridge design & Engineering home
Bridge design & Engineering logo
menu
  • Sign Out
  • Edit My Account
menu
  • Sign In
  • Latest
    • News
    • Features
    • Issue
    • Videos
    • Events & Webinars
    • On-Demand Learning
    • B2P - Builds
    • Bentley Microsite
  • Magazine
    • Current Issue
    • Back Issues
    • Supplements
    • BD&E Presents
  • Directory
  • Business
    • Company Profile
    • New products
    • Equipment
    • Jobs
  • Channels
    • Asset management
    • Business and finance
    • Construction
    • Design and analysis
    • Failures and accidents
    • Project reports
    • Technology
  • Our Events
    • Bridges 2026
    • Bridges Scotland 2026
    • Bridges Awards 2025
  • Contact
    • Our Team
    • Advertise
    • GET MEDIA KIT
    • Get Published

Share

  •  
  •  
  •  
  •  

Construction

31 Jan 07

Final deck section positioned at Tacoma Narrows

The last deck section was lifted into place this week at the new Tacoma Narrows Bridge in the US state of Washington. The section is in the bridge's east side span, close to the Tacoma tower. It had been taken off the barge Swan a few days earlier and suspended from a lifting gantry while crews made final preparations to winching the 504t steel structure into place. Opening of the bridge is expected to take place in August.

#Lifting & launching
comments powered by Disqus

Related Articles

A unique 128.6m-long steel arch is transported near Madrid Airport image

A unique 128.6m-long steel arch is transported near Madrid Airport

Girders buckle during Edmonton bridge replacement image

Girders buckle during Edmonton bridge replacement

Gateshead Bridge operation runs smoothly image

Gateshead Bridge operation runs smoothly

Winched to glory image

Winched to glory

Share

  •  
  •  
  •  
  •  

Latest News

  • Bridge demolition shows true meaning of “Germany’s speed”
  • Australia: preparing for zero-carbon concrete
  • US$650,000 in prizes for beautifying USA’s infrastructure
  • Laos: funding boost for Japanese girder recycling research
  • Brazil: Guaratuba Bridge approaches finish
  • More News

Related Articles

A unique 128.6m-long steel arch is transported near Madrid Airport image

A unique 128.6m-long steel arch is transported near Madrid Airport

Girders buckle during Edmonton bridge replacement image

Girders buckle during Edmonton bridge replacement

Latest News

  • Bridge demolition shows true meaning of “Germany’s speed”
  • Australia: preparing for zero-carbon concrete
  • US$650,000 in prizes for beautifying USA’s infrastructure
  • Laos: funding boost for Japanese girder recycling research
  • Brazil: Guaratuba Bridge approaches finish
  • More News
  • Copyright © 2026 - Hemming Group Ltd All rights reserved.
  • Privacy Policy | Terms & Conditions

 

logo

Important Update: Bridge Design & Engineering Magazine


For more than 31 years, Bridge Design & Engineering has been a trusted source of new insights, knowledge, and connections for the global bridge community.  With the rapid shifts in the publishing landscape and increasing costs, sustaining the printed magazine at the high level of quality our readers expect has become increasingly challenging.  After careful consideration, Hemming Group Ltd has made the difficult decision to discontinue the print publication.


You will continue to have full access to the Bridge Design and Engineering website - including the complete archive. Although the site will no longer be updated, the archive remains a rich resource of engineering knowledge and project insight.  You can also continue to access the Bridge Directory, IBIG, through the website or directly at: https://www.bdeibig.com/


While this marks the end of an era, it also opens a new chapter, one focused on strengthening the connections, collaboration, and technical excellence that our community thrives on.  Our energy and investment will now be directed toward expanding and enhancing our industry leading events that bring the bridge community together.


Our flagship events Bridges and Bridges Scotland will continue to thrive as essential annual gatherings for bridge owners, managers, designers, engineers, and suppliers.  These events play a vital role in sharing innovation, showcasing best practice and emerging technologies, and fostering meaningful collaboration across the industry.  We are excited to build on their success and will further develop these events in the years ahead.


For more information, please email enquiry.bridge@hgluk.com