Bilfinger Berger is the design and build contractor for the cable-stayed bridge working with consultant Leonhardt, Andrä und Partner. The original design was by TY Lin International. Freyssinet is subcontractor for the cables.

The official inauguration of the bridge is due to take place on 15 August.