Wind tunnel testing was carried out for three generic options: adding to the existing railing, replacing the existing railing, or adding a netting system that would extend out horizontally from the bridge. In total more than 70 variations were tested. Each was also tested in conjunction with a moveable median barrier in all possible lane configurations. A second phase will now develop options for further evaluation.