The new multi-span fixed bridge replaces the original 69-year-old narrow causeway structure, whose drawbridge section had been inoperable since 1988. The bridge provides a vital link on the route between the US and Canada that connects Vermont, New York and the Providence of Quebec. Cianbro is contractor for the US$32 million project, which also includes removal of the old structure.