The Panama Canal Authority has issued a tender for engineering services for the final design of a new long-span bridge across the canal.

The bridge will be have a clearance of 75m above water level. The tender has a deadline of 30 March and the design period will be 270 days. ACP aims to tender the construction of the bridge in a year's time.