It has appointed FHECOR to work on the project, which is aimed at bringing the capacity of the bridge to current code requirements as well as improving the structure's performance.

The bridge consists of three steel tied-arch spans, each with a length of 50m, plus six masonry-vault spans with lengths of 8m.

FHECOR - Rio Guadalquivir bridge