Midmac & Porr Joint Venture will build Gewan Island’s entrance bridge, a 250m-long structure with two 43m-tall pylons. The bridge will  link UDC’s adjacent developments of Gewan Island and the Pearl-Qatar.

In addition, UDC has appointed KEO International to supervise construction of the bridge as well as associated infrastructure work, building and landscaping at Gewan Island.

Gewan Island Bridge