The 929m-long cable-stayed bridge will be built under a design and construction contract. It will carry six road lanes, twin light rail tracks and two pedestrian/cycle lanes. Client for the scheme is the City of Belgrade, represented by the Belgrade Land Development Public Agency. The city is seeking a loan from the European Bank for Reconstruction & Development towards the project costs.