HKZMB

Work is now entering the final phase, with tasks such as surfacing.

The project's 55km route includes three major bridges with a total length of 22.9m as well as extensive viaducts and 6.7km of tunnels.

HKZMB

A video was published recently highlighting construction activity (link opens in new tab).