Bridge design & Engineering home
Bridge design & Engineering logo
menu
  • Sign Out
  • Edit My Account
menu
  • Sign In
  • Latest
    • News
    • Features
    • Issue
    • Videos
    • Events & Webinars
    • On-Demand Learning
    • B2P - Builds
    • Bentley Microsite
  • Magazine
    • Current Issue
    • Back Issues
    • Supplements
    • BD&E Presents
  • Directory
  • Business
    • Company Profile
    • New products
    • Equipment
    • Jobs
  • Channels
    • Asset management
    • Business and finance
    • Construction
    • Design and analysis
    • Failures and accidents
    • Project reports
    • Technology
  • Our Events
    • Bridges 2026
    • Bridges Scotland 2026
    • Bridges Awards 2025
  • Contact
    • Our Team
    • Advertise
    • GET MEDIA KIT
    • Get Published

Share

  •  
  •  
  •  
  •  

Project reports

06 Jun 05

HK government gives Stonecutters update

Work on Hong Kong's Route 8 expressway is progressing well, according to Hong Kong Highways Department deputy project manager David English. The first steel deck segment is due to be lifted into place on Stonecutter's Bridge by the end of next year. The bridge is part of the US$1.67 billion Route 8 highway, which also includes the Lai Chi Kok Viaduct and the West Tsing Yi Viaduct. The cable-stayed Stonecutters Bridge will have a record-breaking 1,018m main span. Piling for the eastern backspan has been completed, while piling for the western backspan and west tower is in progress, said English. The steel wire for the stay cables is being made in Japan and is ready for delivery to its fabrication yard. The first segment of the steel deck is now being made in the Shanhaiguan fabrication yard, near the Great Wall's eastern entrance. The fabricated steel will then be shipped to Dongguan for assembly, before being delivered to Hong Kong for erection.

#Cable-stayed
comments powered by Disqus

Related Articles

 Foundation construction begins for new Wear crossing image

Foundation construction begins for new Wear crossing

Cambodia begins work on cable-stayed bridge image

Cambodia begins work on cable-stayed bridge

Hockey stick bridge links two green spaces on UK river image

Hockey stick bridge links two green spaces on UK river

Canada chooses preferred bidder for Pattullo Bridge replacement  image

Canada chooses preferred bidder for Pattullo Bridge replacement

Share

  •  
  •  
  •  
  •  

Latest News

  • Bridge demolition shows true meaning of “Germany’s speed”
  • Australia: preparing for zero-carbon concrete
  • US$650,000 in prizes for beautifying USA’s infrastructure
  • Laos: funding boost for Japanese girder recycling research
  • Brazil: Guaratuba Bridge approaches finish
  • More News

Related Articles

 Foundation construction begins for new Wear crossing image

Foundation construction begins for new Wear crossing

Cambodia begins work on cable-stayed bridge image

Cambodia begins work on cable-stayed bridge

Latest News

  • Bridge demolition shows true meaning of “Germany’s speed”
  • Australia: preparing for zero-carbon concrete
  • US$650,000 in prizes for beautifying USA’s infrastructure
  • Laos: funding boost for Japanese girder recycling research
  • Brazil: Guaratuba Bridge approaches finish
  • More News
  • Copyright © 2026 - Hemming Group Ltd All rights reserved.
  • Privacy Policy | Terms & Conditions

 

logo

Important Update: Bridge Design & Engineering Magazine


For more than 31 years, Bridge Design & Engineering has been a trusted source of new insights, knowledge, and connections for the global bridge community.  With the rapid shifts in the publishing landscape and increasing costs, sustaining the printed magazine at the high level of quality our readers expect has become increasingly challenging.  After careful consideration, Hemming Group Ltd has made the difficult decision to discontinue the print publication.


You will continue to have full access to the Bridge Design and Engineering website - including the complete archive. Although the site will no longer be updated, the archive remains a rich resource of engineering knowledge and project insight.  You can also continue to access the Bridge Directory, IBIG, through the website or directly at: https://www.bdeibig.com/


While this marks the end of an era, it also opens a new chapter, one focused on strengthening the connections, collaboration, and technical excellence that our community thrives on.  Our energy and investment will now be directed toward expanding and enhancing our industry leading events that bring the bridge community together.


Our flagship events Bridges and Bridges Scotland will continue to thrive as essential annual gatherings for bridge owners, managers, designers, engineers, and suppliers.  These events play a vital role in sharing innovation, showcasing best practice and emerging technologies, and fostering meaningful collaboration across the industry.  We are excited to build on their success and will further develop these events in the years ahead.


For more information, please email enquiry.bridge@hgluk.com