NCDOT recommends first building a new bridge parallel to the existing Oregon Inlet span and then adding more bridges along the NC 12 as necessitated by shoreline erosion. An inter-departmental team is reviewing NCDOT's recommended alternative along with six other options. Construction under a design and build contract is scheduled to be let in early 2009.