ED Swett is the contractor for the project, which involves two bridges on the I-89 highway, crossing US Route 4 and the Mascoma River.
This project has a completion date of October 2022 and consists of the construction of a new bridge between the existing I-89 bridges over US 4, replacement of the structural steel and deck on the existing bridges over US 4, rehabilitation of the I-89 bridges over the Mascoma River and work on the on and off ramps.