August 2025 Subscribe
Welcome to Bd&e #120, our latest issue with a spotlight on Australasia and footbridges. Among the articles for your enjoyment in this edition are:
- A specialist contractor and an international authority on BIM mark our 30th anniversary by reflecting on the last three decades and sharing insights into what the future may hold
- Australian bridge tour: selected highlights of projects presented at the Austroads Bridge Conference
- Molonglo balance act: building the longest weathering steel span in the southern hemisphere
- Innovation friendly: bold multimodal bridge opens with a typology not seen before in the USA
- A bridge of two halves: a single Norwegian bridge is built by separate teams for separate clients
- Tensile tapestry: footbridge with unique woven stay-cable pattern opens in Philadelphia
- A feast for eye and mind: preview of some of the Footbridge Awards 2025 finalists
- Betwixt ice and rock: seismic mitigation measures for an Icelandic bridge spanning a fault line
- Winched to glory: non-traditional launching system successfully deployed for arch span in India
- High-end trail-making: multifunctional solution enables bridge replacement in Vancouver Island
- Human-centric vision: exploring the benefits of human-centric digital twins for heritage bridges
- WIM-win situation: success in deterring overweight vehicles boosts technology for New York bridges
Download the contents page via the link on the right for full details of what's in this issue.
Not yet a subscriber?
- Download your free Bd&e article here to review.