MX3D Bridge being installed

The 12m-long MX3D Bridge, which was originally due to be installed in 2019, will be finalised over the next few days and the sensor network will be tested ahead of the bridge being opened to visitors later this month.

MX3D Bridge

The project was announced in 2015 and the printing was completed in 2018 (links open in new tabs).