Bridge design & Engineering home
Bridge design & Engineering logo
menu
  • Sign Out
  • Edit My Account
menu
  • Sign In
  • Latest
    • News
    • Features
    • Issue
    • Videos
    • Events & Webinars
    • On-Demand Learning
    • B2P - Builds
    • Bentley Microsite
  • Magazine
    • Current Issue
    • Back Issues
    • Supplements
    • BD&E Presents
  • Directory
  • Business
    • Company Profile
    • New products
    • Equipment
    • Jobs
  • Channels
    • Asset management
    • Business and finance
    • Construction
    • Design and analysis
    • Failures and accidents
    • Project reports
    • Technology
  • Our Events
    • Bridges 2026
    • Bridges Scotland 2026
    • Bridges Awards 2025
  • Contact
    • Our Team
    • Advertise
    • GET MEDIA KIT
    • Get Published

Share

  •  
  •  
  •  
  •  

Project reports

28 Jun 00

Dampers likely solution for Millennium Footbridge

Engineers investigating excessive movement on London's Millennium Footbridge have said that the addition of dampers to the structure is likely to be the best solution to the problem. Adding stiffness to the suspension bridge, which had to be closed only two days after being opened to the public, would not provide a complete solution as it is only possible to do this on the side spans and not on the central span over the main shipping channel. Investigations are currently under way to identify the type and size of dampers, and the optimal locations at which to install them on the bridge. Final results of testing are expected to be known in around six weeks' time.

#Footbridge
comments powered by Disqus

Related Articles

Plans displayed for Ramboll Whitbybird bridge image

Plans displayed for Ramboll Whitbybird bridge

Consultation begins on Oxford footbridge image

Consultation begins on Oxford footbridge

Aberdeenshire set to issue tender for footbridge study image

Aberdeenshire set to issue tender for footbridge study

Timber bridge installed to extend New York’s High Line image

Timber bridge installed to extend New York’s High Line

Share

  •  
  •  
  •  
  •  

Latest News

  • Bridge demolition shows true meaning of “Germany’s speed”
  • Australia: preparing for zero-carbon concrete
  • US$650,000 in prizes for beautifying USA’s infrastructure
  • Laos: funding boost for Japanese girder recycling research
  • Brazil: Guaratuba Bridge approaches finish
  • More News

Related Articles

Plans displayed for Ramboll Whitbybird bridge image

Plans displayed for Ramboll Whitbybird bridge

Consultation begins on Oxford footbridge image

Consultation begins on Oxford footbridge

Latest News

  • Bridge demolition shows true meaning of “Germany’s speed”
  • Australia: preparing for zero-carbon concrete
  • US$650,000 in prizes for beautifying USA’s infrastructure
  • Laos: funding boost for Japanese girder recycling research
  • Brazil: Guaratuba Bridge approaches finish
  • More News
  • Copyright © 2026 - Hemming Group Ltd All rights reserved.
  • Privacy Policy | Terms & Conditions

 

logo

Important Update: Bridge Design & Engineering Magazine


For more than 31 years, Bridge Design & Engineering has been a trusted source of new insights, knowledge, and connections for the global bridge community.  With the rapid shifts in the publishing landscape and increasing costs, sustaining the printed magazine at the high level of quality our readers expect has become increasingly challenging.  After careful consideration, Hemming Group Ltd has made the difficult decision to discontinue the print publication.


You will continue to have full access to the Bridge Design and Engineering website - including the complete archive. Although the site will no longer be updated, the archive remains a rich resource of engineering knowledge and project insight.  You can also continue to access the Bridge Directory, IBIG, through the website or directly at: https://www.bdeibig.com/


While this marks the end of an era, it also opens a new chapter, one focused on strengthening the connections, collaboration, and technical excellence that our community thrives on.  Our energy and investment will now be directed toward expanding and enhancing our industry leading events that bring the bridge community together.


Our flagship events Bridges and Bridges Scotland will continue to thrive as essential annual gatherings for bridge owners, managers, designers, engineers, and suppliers.  These events play a vital role in sharing innovation, showcasing best practice and emerging technologies, and fostering meaningful collaboration across the industry.  We are excited to build on their success and will further develop these events in the years ahead.


For more information, please email enquiry.bridge@hgluk.com