It is on the river's lower reaches, about 10km from the second bridge. The US$929 million bridge is expected to come into operation in 2013.

Results of a national evaluation of the third bridge were published last week. The bridge, which was opened in 2005, was given a construction quality rating of 97.35%, putting it into the "excellent category". Such evaluations are carried out at least two years after completion.