Bridge design & Engineering home
Bridge design & Engineering logo
menu
  • Sign Out
  • Edit My Account
menu
  • Sign In
  • Latest
    • News
    • Features
    • Issue
    • Videos
    • Events & Webinars
    • On-Demand Learning
    • B2P - Builds
    • Bentley Microsite
  • Magazine
    • Current Issue
    • Back Issues
    • Supplements
    • BD&E Presents
  • Directory
  • Business
    • Company Profile
    • New products
    • Equipment
    • Jobs
  • Channels
    • Asset management
    • Business and finance
    • Construction
    • Design and analysis
    • Failures and accidents
    • Project reports
    • Technology
  • Our Events
    • Bridges 2026
    • Bridges Scotland 2026
    • Bridges Awards 2025
  • Contact
    • Our Team
    • Advertise
    • GET MEDIA KIT
    • Get Published

Share

  •  
  •  
  •  
  •  

Project reports

21 Dec 04

Macau's Sai Van Bridge completed

San Van Bridge in Macau has been inaugurated ahead of its opening to traffic next month. The ribbon was cut by China's president Hu Jintao and Macau's chief executive Edmund Ho Hau Wah as part of ceremonies marking the 5th anniversary of Macau's return to China. The 2.2km cable-stayed bridge has been the largest project in the special administrative region. There are two decks in the US$70 million structure, with the enclosed lower section reserved for use during typhoons. A light rail system may also be installed.

#Cable-stayed
comments powered by Disqus

Related Articles

Tendering gets under way for bridge to replace Canada's George Massey Tunnel image

Tendering gets under way for bridge to replace Canada's George Massey Tunnel

Contractor named for detailed design and construction of Canadian cable-stayed bridge image

Contractor named for detailed design and construction of Canadian cable-stayed bridge

Record-breaking bridge opens in China image

Record-breaking bridge opens in China

Brazil signs agreement for 12km bridge image

Brazil signs agreement for 12km bridge

Share

  •  
  •  
  •  
  •  

Latest News

  • Bridge demolition shows true meaning of “Germany’s speed”
  • Australia: preparing for zero-carbon concrete
  • US$650,000 in prizes for beautifying USA’s infrastructure
  • Laos: funding boost for Japanese girder recycling research
  • Brazil: Guaratuba Bridge approaches finish
  • More News

Related Articles

Tendering gets under way for bridge to replace Canada's George Massey Tunnel image

Tendering gets under way for bridge to replace Canada's George Massey Tunnel

Contractor named for detailed design and construction of Canadian cable-stayed bridge image

Contractor named for detailed design and construction of Canadian cable-stayed bridge

Latest News

  • Bridge demolition shows true meaning of “Germany’s speed”
  • Australia: preparing for zero-carbon concrete
  • US$650,000 in prizes for beautifying USA’s infrastructure
  • Laos: funding boost for Japanese girder recycling research
  • Brazil: Guaratuba Bridge approaches finish
  • More News
  • Copyright © 2026 - Hemming Group Ltd All rights reserved.
  • Privacy Policy | Terms & Conditions

 

logo

Important Update: Bridge Design & Engineering Magazine


For more than 31 years, Bridge Design & Engineering has been a trusted source of new insights, knowledge, and connections for the global bridge community.  With the rapid shifts in the publishing landscape and increasing costs, sustaining the printed magazine at the high level of quality our readers expect has become increasingly challenging.  After careful consideration, Hemming Group Ltd has made the difficult decision to discontinue the print publication.


You will continue to have full access to the Bridge Design and Engineering website - including the complete archive. Although the site will no longer be updated, the archive remains a rich resource of engineering knowledge and project insight.  You can also continue to access the Bridge Directory, IBIG, through the website or directly at: https://www.bdeibig.com/


While this marks the end of an era, it also opens a new chapter, one focused on strengthening the connections, collaboration, and technical excellence that our community thrives on.  Our energy and investment will now be directed toward expanding and enhancing our industry leading events that bring the bridge community together.


Our flagship events Bridges and Bridges Scotland will continue to thrive as essential annual gatherings for bridge owners, managers, designers, engineers, and suppliers.  These events play a vital role in sharing innovation, showcasing best practice and emerging technologies, and fostering meaningful collaboration across the industry.  We are excited to build on their success and will further develop these events in the years ahead.


For more information, please email enquiry.bridge@hgluk.com