The bridge has been closed to traffic since August, when part of its pier support system shifted and caused a section of the deck to buckle.

Fast-tracked reconstruction will be carried out to reinstate the bridge and reopening is expected before the end of this year.

Damaged portions have already been demolished and detailed design of the repairs has been carried out, as well as ground stablisation work.