The bridge will be about 200m long and has an estimated construction cost of US$5.7 million. It will cross US Highway 75 to link the main campus to the former Creighton University Medical Center, which is being turned into residential and retail space.
Developer NuStyle is currently finalising the design to allow the pier and tower work to begin this month ready for the bridge superstructure to be lifted into place in the spring of 2018.