Last weekend saw the successful installation of the new arch bridge spanning the Thomassentunnel and the A15 and N15 motorways. The structure was in place by the evening of 30 May.
The railway bridge forms a key link in the Theemswegtracé, a new branch of the port railway line that is over 4km in length.
The first trains are expected to travel along the Theemswegtracé by late 2021. Read more about the lifting operation here.